Requirements And Testing Of Roll Crusher At The Factory, Requirements and testing of roll crusher at the factory |
Bine ati venit Vizitator ( Logare | Inregistrare )
Requirements And Testing Of Roll Crusher At The Factory, Requirements and testing of roll crusher at the factory |
Mar 23 2020, 06:17 AM
Postare
#1
|
|
Member Grup: Members Plus Postari: 101 Inscris la: 1-June 18 Membru nr.: 239,181 |
4. High-quality accessories to improve wear resistance and extend the service life of the machine. 5. Before conveying the roller crusher, the technical inspection department will test the empty machine of the crusher. The bearing temperature needs to be tested during the operation of the empty machine to ensure that the bearing temperature is not higher than the standard. At the same time, to ensure the stable operation of the roller crusher during operation, without excessive noise, so that the performance of the crusher meets the requirements. 6. Test the normal production process of the roll crusher During this period, continuous operation of the roll crusher must be ensured, and the crushing rate and discharge size must also be tested. At the same time, when the load is running, the temperature of the bearing must not be higher than the standard temperature. At the same time, during the work, the vibration amplitude is guaranteed to be small, and the crushing cavity must not emit abnormal sounds or prevent the card machine from occurring. |
Daca iti place acest topic recomanda pe facebook : | |
|
|
Versiune Lo-Fi | Acum este ora: 26th April 2024 - 09:55 PM |