Steel jacket temperature prefabricated buried pipe insulation related knowledge introduction
For steel jacket temperature prefabricated buried pipe insulation, the most important is the quality of the first. Because buried steel jacket pipe insulation ships bronze bushings for conveying high temperature and pressure steam, if the pipe leak or substandard quality issues like retirement, then the loss will be very large, there may be an accident. So everyone in the GCr15 steel sleeve when the purchase must pay attention to product quality, not only for the sake of cheap, quality and price is a degree of cost-effective to do, is not cheap on the line.

rear shock bushings has been applied in the industry, and 45 sets of steel are being more widely recognized and applied, following a brief talk about the construction process of our project of the Ministry of Construction recently buried steam pipe steel jacket their views.

First of all, let's understand the installation process of the Marginal lubricating bushing:

Steel jacket construction process and the process is substantially similar to other heat pipes, mainly in the pipe prefabrication, on different elbow production,

Second, let's talk about the method of construction steel jacket steam pipe main steps:

Participate in the construction must seriously familiar with the drawings, an overview of the pipeline system works, construction technology installation requirements, precautions, so that everyone can define their tasks and achieve the desired quality standards.


Get the materials ready
As noted in the drawings and technical personnel requested material planning, material planning should indicate the type size, material, quantity and standard number. The materials used in this project is a regular and famous manufacturers of the products, and must have material proof and the corresponding certificate, where necessary, should go to the factory to inspect the valve must have a pressure test records, bulk density insulation materials must meet the design requirements and quality standards, the custodian must test materials approach, make a record.
Measurement and actinomycetes
Referring to the transfer of civil engineering information, check the correct position of professional civil engineering, trench depth, width meets the requirements and make a re-examination record, if there is tolerance or the wrong place must be promptly reported to the owners and designers, as soon as possible.
Construction workers a clear understanding of the heating pipes, along the structure, condition of the building, buried part of the situation to clear obstructions and underground structures, such as underground obstacles encountered,BTU for medium duty must be promptly reported to the owner or the designer, if necessary, pipes need to bypass or make changes.